Hunan Construction Engineering Group Co., LTD. North Station Road (eight iron and steel highway - airport expressway) construction project
2025.01.17
Return list
Construction contents: including road, bridge, integrated corridor and other projects, the two-way four lanes will be converted into two-way eight lanes by the way of widening on both sides, and a viaduct of about 1.6 kilometers in length across the Uzbek high-speed and railway line will be built simultaneously, which is of great significance for improving the traffic environment of Urumqi and the distribution function of the international dry port area.
Recommended case
400 - 800 - 7220
盾盾AI,只需一扫 问题迎刃而解