Hunan Construction Engineering Group Co., LTD. North Station Road (eight iron and steel highway - airport expressway) construction project
Construction contents: including road, bridge, integrated corridor and other projects, the two-way four lanes will be converted into two-way eight lanes by the way of widening on both sides, and a viaduct of about 1.6 kilometers in length across the Uzbek high-speed and railway line will be built simultaneously, which is of great significance for improving the traffic environment of Urumqi and the distribution function of the international dry port area.